AZCK COMMAND

The business face. Your own login — sessions are never handed over.

AZCK COMMAND

Loading calendar…
Pick a day to see it here.
Requests shown
Loading bookings…
Booking
Pick a request on the left.
Project Bus
Jobs shown
Loading the queue…
Job
Total $0.00
Pick a job on the left, or tap + New job.
Project Bus
Schedule — what customers can book
The website reads this live. Blocked time (right) wins over this template.
Loading schedule…
Blocked time — when we're away
Loading blocks…
Loading partners…
Bus dispatcher
Fire a bus to an instance
Prefix routes: @code · @cowork · @design · @reanna · @team — append !urgent for urgent priority. No prefix → forge-cowork.
recent bus traffic
Loading…
Chat
Parked, on purpose
The direct-chat surface (Sentinel, forge-code, Telegram peers) sits nav-hidden on the builder face — a parked experiment, and porting a parked thing as live would be a fake surface. Business comms ride the bus dispatcher. Say the word and the chat moves in properly.
Gifting line
Loading pipeline…
Prototype · QF-100
Batch 1 — 10 units milledSOFT ~34 HRC
17-4PH · local machine shop · 2 HT + sharpened
Batch 2 — H900 temperUNCONFIRMED
Condition A confirmed · temper due 05-29
6 prototypesPENDING
Not yet heat-treated
Target hardnessSPEC
42–47 HRC
Detail
Batch 1 — 10 units milled
17-4PH · local machine shop
10 units milled. 2 heat-treated + sharpened, out field-testing with hunters. Came in soft (~34 HRC) — stock wasn't Condition A, so the field samples are imperfect. Target 42–47 HRC.
Batch 2 — H900 temper
solution-treated · Condition A
Solution-treated to Condition A (confirmed). H900 temper scheduled 2026-05-29 — result still unconfirmed. This batch proves the hardness spec.
6 prototypes
awaiting heat-treat
Six prototypes milled, not yet heat-treated. Queue behind the Batch 2 result so the temper recipe is locked first.
Target hardness
spec · 42–47 HRC
The blade needs 42–47 HRC to hold an edge without going brittle. Batch 1 landed soft because the stock wasn't Condition A.
QuadFang bus
Loading…
Roadmap
1 · Prototype provenIN PROGRESS
Hardness + field feedback
2 · Manufacturing routeDECIDE
CNC vs casting vs milling
3 · Funding securedQ2 ENDS 06-30
6 tracks · AI in motion
4 · Field test passPENDING
2 hunters carrying heads
5 · Launch / storePAUSED
Shopify closed 06-01
Detail
Prototype proven
milestone 1
Heat-treat consistent at 42–47 HRC plus real field feedback from the hunters carrying Batch 1. Unlocks everything downstream.
Manufacturing route
milestone 2 · decide
First Swiss shop says the 4-blade geometry won't turn. Routes: live-tooling / multi-axis CNC, casting + finish, or keep milling. Pick a lane to quote next.
Funding secured
milestone 3 · Q2 ends 06-30
6 tracks (SR&ED · IRAP · CDAP · AMPG · AWE BRIDGE · Futurpreneur). Alberta Innovates in motion; SR&ED story strong.
Field test pass
milestone 4 · pending
Two hunters carry Batch 1 heads. Their feedback decides whether geometry + hardness are right.
Launch / store
milestone 5 · paused
Shopify store closed 06-01; relaunch once the manufacturing route is locked and stock is real.
QuadFang bus
Loading…
Planner · open
Decide manufacturing routeOPEN
Pick the lane to test next
Lock funding askOPEN
Amount + use-of-funds for Jane
Chase Horizon + GambitWAITING
Quotes + Aurora live-tooling
Confirm Batch 2 resultOVERDUE
Was due 05-29
Reply to grant check-inAWAITING YOU
bus #1976
Detail
Decide manufacturing route
open decision
Swiss looks unlikely. Pick the next lane to test: live-tooling CNC quote (Aurora offered), casting + finish, or keep milling. Gates the roadmap.
Lock funding ask
open decision
Lock the amount + use-of-funds you'll name to Jane / Innovate NW. Bring the pitch deck, not the business plan.
Chase Horizon + Gambit
waiting on replies
Horizon emailed 05-01, no reply. Gambit unclear. Decide on Aurora's live-tooling offer (fixture cost).
Confirm Batch 2 H900 result
overdue · was 05-29
The temper result is the gap. Chase the local machine shop for the H900 hardness numbers.
Reply to grant check-in
awaiting you · bus #1976
The grant tracker has status notes but no dates yet. Your reply sets the weekly check-in cadence.
QuadFang bus
Loading…
QuadFang tasks
Loading tasks…
Detail
Pick a task on the left to see its detail.
QuadFang bus
Loading…
Sections
Loading sections…
Pick a section to blow it up in the middle. "Full Canvas" shows the whole sheet.
QuadFang bus
Loading…
[ Shop ]
Loading heat treat…
Active2
🇩🇪 Hannes Nagel
Day 2 · Phase A · 9w
2 to sign
🇫🇷 Corentin
Phase A · 17w
3 to sign
📚What we're teachingAZCK intern curriculum
Loading…
Hannes Nagel
🇩🇪
Day 2 of 45 · Phase A
May 19 → Jul 18 · 9-week stay · capstone TBD · transport: our vehicle 8:45
↗ Open Hannes's intern page
▾ Project Bus loading…
to:
Loading…
Today · Day 2 · Hannes
Wed · May 20
Shop 9:00 → 18:00 · Lead Alessio
8:45
🚗 Pickup from rental (our vehicle)
Done
9:00
🏭 Shop open · Hannes in
Done
9:00–9:30
📋 Day-1 wrap review · 3-question recap
Done
9:30 → 12:00 · NOW
🔥 Bench block 1 — Alessio's call
direction set in the moment · steel + project
In progress
12:00 → 13:00
🍽️ Lunch (Hannes brings own)
13:00 → 16:00
🔥 Bench block 2 — continue or pivot
16:00 → 17:30
🛠️ Late block — Wed runs to 18:00
17:30 → 18:00
📒 End-of-day wrap · 3 questions → running log
18:00
🚗 Drop home — "see you tomorrow"
Tomorrow · Thu May 21
Shop 9:00 → 16:00 · pickup 8:45 · early close — Thu is a 9–4 day
Forms · waivers · paperwork
1 to file · 2 to sign
Hannes · Safety Acknowledgment
Hannes_Safety_Acknowledgment_2026-05-19.pdf
Signed by Hannes + Alessio · May 19 · awaiting Reanna to file
Signed — awaiting file May 19 10:47
Hannes · Photo Permission
Photo Permission Release
Print · sign · scan back — not yet on file
To sign
Hannes · Tool / Equipment Waiver
Tool & Equipment Use Waiver
Required before solo use of any powered station
To sign
Corentin · Safety Acknowledgment
Safety Acknowledgment (FR version)
To clone from Hannes pack · target signing date May 23 (arrival)
Pre-arrival
Corentin · Convention de Stage
School internship agreement
Reanna pulling from admin@ inbox · French school side
Reanna · pending
Where the signed copies live
My Drive / AZCK Ltd / Opportunities / Intern-Program-2026-Hannes-Corentin /
Running logs · end-of-day recap
Filled at 17:30 → 18:00 daily
Hannes · 🇩🇪
Today · Wed May 20 · Day 2
Awaiting end-of-day wrap
Alessio fills the 3 questions at 17:30 → log to Hannes_Running_Log.md
Pending today
Tue May 19 · Day 1
Welcome · safety · shop tour
🌟 best — 😬 hardest — 🎯 tomorrow · 3 answers transcribed to Running_Log.md
Logged May 19 16:00
Corentin · 🇫🇷
Pre-arrival
No logs yet — arrives May 23
First log entry expected Sat May 23 evening (arrival day)
Not yet
Phase tracker · A → B → C
From AZCK Intern Program v1.0
Hannes · currently Phase A · Intro
Phase A · Intro
Now
Safety · PPE · shop tour · steel familiarity · grinder basics
In progress · Day 2
Phase B · Build
Next
First knife · grinding · heat treat · finishing · sharpening
Not started
Phase C · Personal
Capstone
TBD — Hannes picks a personal project for the last weeks
Not started
Corentin · pre-arrival
Phase A · Intro
Starts May 23
Same intro as Hannes · safety · tour · steel
Pre-arrival
Phase B · Build
Mid-stay
First knife · production lines · sharpening
Pre-arrival
Phase C · Capstone
QuadFang broadhead
17-week stay closes with a finished broadhead prototype
Pre-arrival
Source of truth
My Drive / AZCK Ltd / Opportunities / Intern-Program-2026-Hannes-Corentin / AZCK_Intern_Program_v1.0.md
Loading programs…
Pick a program above.